Design lead, piling contractor
You need a short list of diameters and lengths that pass the ground and the section, and you need the concrete quantity of each. A shorter pile is only a saving if the checks that allowed it are visible. Material cost and carbon are read off those quantities and the rates you enter. They are not a separate claim.