Foundation design for large buildings

Less concrete in the ground. A result the checking engineer can refuse.

ProFound compares bored-pile options for a large building: length, diameter, reinforcement, material cost, and carbon. It is written for the design lead at a piling contractor, and for the consultant who is allowed to reject the result.

Who it is for

Design lead, piling contractor

You need a short list of diameters and lengths that pass the ground and the section, and you need the concrete quantity of each. A shorter pile is only a saving if the checks that allowed it are visible. Material cost and carbon are read off those quantities and the rates you enter. They are not a separate claim.

Consultant who can reject the result

You need the method, the actions, and the check that governs. A ranked table with no audit trail is not something to accept. The same result should be refusable: wrong ground model, wrong factor, a cage that fails shear, a carbon rate that is only a placeholder.

What a result must show

The research model already calculates the four items below for a solid circular bored pile. This page describes that scope. It does not mean the website can produce the numbers.

  1. 01

    Lateral response

    How the pile displaces, rotates, shears, and bends in the ground under the lateral actions that were entered.

  2. 02

    Axial resistance

    How compression and tension get into the shaft and the toe, and whether the factored axial actions sit inside the resistance that was modelled.

  3. 03

    Section and reinforcement

    Whether the concrete section, the cage, and any central bar pass the ultimate axial, bending, and shear checks the model is written to apply.

  4. 04

    Material consequence

    Among the options that pass, which uses less concrete, and what the entered rates then imply for material cost and embodied carbon. Cost and carbon can pick different piles.

A published comparison should name the options that were tested, the length at which each one passed, and the reason a diameter was rejected. It should show both winners when cost and carbon disagree. The search ranks the alternatives it was asked to test. It does not prove that an untested pile would be worse.

What stays with the engineer

The ground investigation, the soil model, the actions and factors, cover, laps, the pile-head connection, corrosion, and whether a code clause applies to this job. ProFound prepares a comparison. The person who signs the design decides whether the comparison is fit to use.

What this site will not say

  • There is no claim that software designs the foundation.
  • There is no claim that a model has replaced the checker.
  • There are no savings figures on this page. A percentage without a project, a ground model, and a baseline pile would be invented.
  • Prices and carbon factors in the research model are editable screening inputs. This site does not present them as measured project values.

The tool

The app is not connected to the research model yet. The calculation stays in its original files, outside this website’s repository, and those files are not edited to dress up this page.

Read the placeholder for the tool